Projects with Service Engineers

We have a close relationship with Service Engineers. We both understand how the other operates. When we undertake projects together the "grey" areas that are often not allowed for are covered. This makes the end result good for everyone.

Some of the projects we have been involved with Service Engineers, either as a sub contractor or both subbing directly to the head contractor are;

  • All of our contracts at North Shore Waste Water Treatment Plant
  • Army Bay WWTP
  • Suva Water Treatment Plant Upgrades
  • Genesis Energy SNG Plant.
  • Ruakaka Wastewater Treatment Plant.
  • Beachlands Wastewater Treatment Plant.

 

Some smaller projects not mentioned elsewhere.

  • An upgrade of Otorohanga District Councils', Tihiroa, Water Treatment  Plant. This plants takes water from the Waipa River, treats the water and pumps away to a reservoir. We installed a new Allen Bradley Control system, regulating the flow rates and dosing, based upon set points received via telemetry.  
  • Taupo District Council, Accacia Bay WWTP Upgrade. Installation of Aeration Blowers and related controls.
  • Marsden Point, Carter Holt Harvey, LVL, Log Conditioning Plant. On this project the complete design, installation, PLC (Allen Bradley) and Scada (InTouch) All design and software was carried out by Current Electrical.
  • Pumping station upgrades for Watercare,
  • Screen changers for Hydro dams, Hydraulic systems (doors & hoists), Level controls on storage tanks and various lighting and power projects. etc.