This is for the installation of a new Dewatering facility at the Te Awamutu Waste Water Treatment Plant and the installation of other pumps, flow meters etc throughout the plant to allow this to happen.
There is also a final de-sludging plant at the discharge point controlled by it's own point to point telemetry system.