This was for the replacement of the existing Gas Generator with a 1900kVA Caterpillar generator and provision of a biogas treatment plant for removal of H2S, siloxanes, water and particulates contaminants from the biogas prior to the new biogas engine.
- Installation of 1900kVA Gas generator
- Refurbishment of the existing 500kVA generator
- Synchronising of the gas and diesel generators with the mains
- A 3,200amp switchboard. Gas Flare equipment.
- An active Lightning protection system
Much of this work was in Gas Hazardous areas and the standard issues with non-complying equipment all being resolved