We have completed and are undertaking a number of small projects for Water Care Services. Some examples below.
The installation of the electrical power and control systems, including the telemetry for Wastewater Pumping Stations. Mostly for new subdivisions at, Beachlands, East Auckland, Jutland Road, McClennan Park, Wesley - Pukekohe and a Reservoir and booster pumping station at Wesley.
A new Wastewater overflow storage tank at Glen Eden
A Wastewater Storage tank in Kohimaramara. This involved an upgrade to the switchboard / MCC, supply and install of new instrumentation and an upgrade of the existing ventilation, flushing systems etc.
New BSP Sampling Chambers and Fibre cabling at West Auckland sites.
Completed Blackbridge Pump Station in Otara. Again an upgrade to the Switchboard / MCC. New mains power supply. New Variable Speed Drives and Pumps.
All WaterCare work requires not only a high level of compliance, but documentation that proves, via an auditable trail, that we have the correct procedures in place to ensure a safe working environment, continuity of supply and high quality workmanship. We put a lot of time and effort into this compliance.