Mount Wellington Quarry has been redeveloped into a housing estate called Stonefields. At the bottom of the old Quarry a lake has been formed.
The contract was to wire 3x 150kW High Lift Pumps to take the stormwater from the lake into WaterCare's Stormwater system and to wire a water treatment plant to supply tap water to the subdivision.
The MCC was built by Lynn Electrical, Variable Speed Drives by Schneider. PLC and SCADA code by PLNZ. Telemetry links the site to WaterCare's Control Room.