Kinoya WWTP is Suva's Waste Water Treatment Plant.
Despite a recent upgrade, it still runs mainly manually. WAF are in the process of upgrading the plant.
We are Currently installing the mechanical mechanism and
electrical controls for a third and new Secondary Clarifier.
In 2014 we installed a new Trickling Filter and installed
Plastic Media on all three of the filters. Upgraded 4 Re-Circ Pumps
and installed and automated desludging actuators on the primary
clarifiers .
In 2013 we completed a new Low Lift Pump Station, replaced the
1600amp main switchboard, Low Lift Station MCC, Control panel and
equipment to allow full automation. A local Touch Screen allows
setting of paremeters and the system is all ready to be connected
to the site SCADA