company logo
Contact Us
  • Home
  • Case Studies
  • Fiji
  • What We Do
  • How We Work
  • About Us
  • Partners
  • Home
  • >Case Studies
  • >Kiritimati Water Supply
Case Studies

Kiritimati Water Supply

This project takes Water from the fresh water lens that sits under the atoll. This water is pumped to the Reservoirs and pumps into the Island reticulation system. We are also installing Solar pumps that using bores take the water from the lens.

The project will be complete early 2018

  • ReservoirReservoir
  • Control PanelControl Panel
  • Wanganui WWTP
  • Waimanu Pump Station
  • Ports of Auckland Reefer Gantry's
  • Am Samoa Runway Lighting
  • WSL Smaller Projects
  • Waitangi Wharf Chatham Island
  • Te Awamutu WWTP
  • KOIL Depot South Tarawa
  • Kiritimati (Christmas Island) Power Stations
  • Kiritimati Water Supply
  • WSL Rosedale CoGen Plant Upgrade
  • Weston Milling Capacty Upgrade
  • WSL North Shore WWTP
  • WSL Waikato WTP - Tuakau
  • WAF Nagado WTP - Nadi
  • WAF Kinoya WWTP - Suva
  • WAF Tamavua and Waila WTP Upgrades
  • WSL Project Hobson Pump Station
  • WAF Generators - Suva
  • POAL Gangway
  • ASPA Pago Pago Waste to Energy
  • Roading Parks etc
  • Kiwi Rail
  • Genesis Energy LPG to SNG. Huntly Power Station
  • WDC Ruakaka WTP
  • WSL Stonefields Pumping Station & WTP
  • WSL Army Bay Wastewater Plant
  • WSL Franklin WTP's
  • Dunlop Bedding
  • Projects with Service Engineers
  • Marina Lock. Downtown Auckland
  • Winstones
  • HDC Kerepehi WTP
  • WSL Beachlands Maraetai WWTP
  • Ritchies Bus Depot
  • General Work
  • Search
  • Contact Us
  • Sitemap